Skip to content
Request a callback
Data hall under construction with cable trays and lighting

Data Centre Construction Services in London

Craftex provides data centre construction services in London. We design, build and commission server rooms and data halls with resilient power, cooling, fire suppression and security.

For a FinTech client we turned an unused basement into a 220 sq m data centre in 10 weeks.

Trusted by Leading Businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drake's
  • POST
  • Close Connection
  • Marnie.
  • Vortex Post
  • Blob
  • Minds Ahead
  • Miiissy
  • Fora
  • gama healthcare
  • Equinix
  • Hubble
  • B-engineering

What our clients say

See all reviews on Google

Got a quote? We’ll beat it.

Already have a quote? Send it to us and we will aim to beat it.

Our data centre construction expertise

A data centre has to run from day one and keep running. We plan power, cooling, fire and security together, so nothing has to be reworked later. Upgrading a live room? See data centre fit-out.

  • Power and UPS

    Dedicated power distribution with UPS and generator integration.

  • Cooling and containment

    Hot and cold aisle containment and high-efficiency cooling units.

  • Cabling

    Structured cabling, organised for growth.

  • Fire suppression

    Gas-based suppression that protects equipment.

  • Security

    Access control and CCTV, specified to your security standard.

  • Monitoring

    Temperature, humidity and energy tracked through the BMS.

How we build your data centre

Load, resilience level, growth plans and the space available.

Power, cooling, fire and security designed together, then one lump-sum price.

Structure, raised floors, containment and services, coordinated with your IT and facilities teams.

Every system tested and documented before go-live.

Reports handed over for your audits; the same team stays on for aftercare.

Switchgear installation in a data centre

Free site audit for your data centre project

Planning a new server room or data hall? We visit, look at the space, power supply and structure, and talk you through the options. No obligation.

Data hall under construction with cable trays and lighting

Free Data Centre Construction & Fit-Out Guide

A clear, step-by-step guide to data centre construction and fit-out, covering planning, design, budgeting and compliance essentials.

Why clients choose Craftex for data centre construction

  • One team, design to commissioning

    No gaps between designer, builder and installer.

  • No downtime

    Manchester expansion: zero service interruptions.

  • Lump-sum pricing

    A clear scope and a fixed number.

  • Around 60% in-house

    Our own labour, tighter control of quality.

  • Ahead of programme

    Every project delivered ahead of programme and on budget.

  • Insured and certified

    ISO and CHAS. £10M public and employers' liability cover.

Independently Certified Contractor for Quality, Safety & Reliability

  • British Assessment Bureau
  • British Assessment Bureau Certificate
  • British Assessment Bureau
  • Constructionline
  • CHAS Accredited Contractor
  • Alcumus

Data centre construction: your questions

How long does a data centre build take?

On our projects: a 220 sq m data centre in a London headquarters took 10 weeks; a 310 sq m expansion in Manchester took 12 weeks.

What resilience level do you build to?

We build to the level your systems need. Our London data centre was built to Tier 3 performance standards.

Can you build inside an occupied building?

Yes. The London project sat in the basement of the client's working headquarters, and all works were staged around their teams.

Do you work outside London?

Yes. We expanded a data centre for a healthcare technology client in Manchester.

What size of projects do you take on?

We take on projects from £100,000 to £10M+.

What else do you build?

Commercial fit-outs such as Portsoken House and its reception, Beaumont House and Medusa. Trends in the sector: UK data centre construction trends.

Book a free data centre site audit

WhatsApp us