Skip to content
Request a callback

London E14

Fit-Out & Refurbishment Contractor in Canary Wharf

Canary Wharf is London's second financial district: office towers, a growing residential skyline and retail and restaurants in the malls and around the docks. Craftex redesigned a 290 sq m penthouse at Pan Peninsula, Millharbour.

We are a London-based design and build contractor, founded in 2016, with our office on Buckingham Palace Road. One team takes your project from survey, design and consents through construction to handover — with around 60% direct labour, ISO and CHAS accreditation, a 4.9★ Google rating and every project to date delivered on budget and ahead of programme.

Planning, consents and site rules in Canary Wharf

Local authority: London Borough of Tower Hamlets. Before any design is fixed we check the planning and ownership position for your address, because in Canary Wharf this decides what is possible and how long it takes:

  • Most buildings are on a private managed estate, so building-management rules, fit-out guides and approved working hours apply alongside Tower Hamlets' requirements.
  • High-rise offices and apartments mean careful logistics: goods lifts, loading-bay slots and protection of common parts.
  • Fire-safety and building-regulations sign-off is particularly important in tall buildings.

We prepare the drawings and statements, submit the applications and build the approval time into your programme — so construction starts on a date you can rely on.

What our projects actually cost

Most contractors avoid numbers. These are real Craftex projects — total value, size and time on site — so you can benchmark your budget. Your cost will depend on condition, specification, consents and access; we confirm it in a unit-by-unit cost plan.

ProjectScopeValueSizeTime on site
Portsoken House, AldgateWarehouse-to-office conversion, full M&E£2.2M1,550 sq m7 months
Beaumont House, KensingtonOffice refurbishment, open-plan + meeting rooms£350K750 sq m3 weeks
Drake's, Savile RowFlagship retail refit, live trading£410K120 sq m12 weeks
Medusa, KnightsbridgeTurnkey spa & clinic, four floors£460K180 sq m17 weeks
Banbury WarehouseFit-out inside a live warehouse£380K148 sq m4 weeks

How a Canary Wharf project runs with Craftex

  1. Site visit and brief. We survey the building, check services and access, and confirm planning, listing and landlord or estate constraints.
  2. Feasibility & Costing Study. Design options, consents route, a detailed unit-by-unit cost plan and a realistic programme.
  3. Design and consents. Our in-house team completes the design and manages applications and licences.
  4. Construction. One project manager runs every trade, with around 60% direct labour.
  5. Handover. Snag-free handover, documentation and aftercare.

Questions about building in Canary Wharf

Have you worked in a Canary Wharf tower?

Yes. We redesigned and rebuilt the 290 sq m penthouse at Pan Peninsula in 10 weeks, including reconfigured services and smart-home features.

Can you fit out an office floor in a managed tower?

Yes. We work to the landlord's fit-out guide, book loading bays and lifts, and schedule noisy work out of hours where required.

How much does a project in Canary Wharf cost?

It depends on scope, condition, specification and access, so we don't publish a price per square foot without seeing the building. As a reference, the table above shows what recent Craftex projects actually cost. Our Feasibility & Costing Study gives you a detailed, unit-by-unit cost plan before you commit.

How long will my Canary Wharf project take?

Programme depends on size, consents and whether the building stays occupied. Our projects have ranged from three weeks for a 750 sq m office refurbishment to seven months for a £2.2M conversion. We give a realistic programme with the cost plan, and every project we have delivered so far has finished ahead of programme.

Who handles consents with London Borough of Tower Hamlets?

We do. Our design and planning team prepares drawings, applications and method statements, and manages planning, listed building consent, building control and landlord or estate licences alongside the build programme.

Do you use subcontractors?

Around 60% of our labour is direct, and one Craftex project manager controls every trade. That gives you one accountable team, consistent quality and no gaps between designer and builder.

What is the minimum project size you take on?

We typically take on projects from around £100k, from single floors and units to whole buildings.

How do I start?

Send us the address, a short description and any drawings or photos. We arrange a site visit, then prepare a Feasibility & Costing Study with design options, consents, a cost plan and a programme for your Canary Wharf project.

Start your Canary Wharf project

Tell us about the building and what you want to achieve.

Did you like our work?

We thought you might! Leave your details here
and we will be in touch to discuss your project

GET FREE CONSULTATION
WhatsApp us