For freeholders and building owners
Airspace Above Your Building: Who Owns It, What You Can Build and Whether to Sell
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
The airspace above a building usually belongs to the freeholder, and it can be sold or leased. Its value depends on three answers: who controls it, whether you can get consent, and whether the building can carry more floors.
- Check the title and every long lease before you pay for drawings.
- Test the planning route: permitted development for some 1948 to 2018 buildings, full planning for most of central London.
- Get a structural survey and a fire strategy view early.
- Then choose: sell with consent, build it yourself, or partner.
The airspace above a building is the space over its roof. In most London buildings it belongs to the freeholder. It can be sold, leased or built on, like any other part of the property.
Whether it is worth anything depends on three questions. Do you control it? Can you get consent to build there? Can the building carry the extra floors? Answer those and you will know whether to sell, develop or partner. Want a straight answer for your building? Book a site visit and our team will check it with you.
Who owns the airspace above a building
Start with the title and the leases, not the roof. Ownership decides who can sell and who can object.
- Freehold building, no long leases. The airspace is normally part of your freehold. You can develop it, sell it or lease it.
- Building with long leasehold flats. Read the leases. Some include the roof or roof space in the top-floor flats. Most reserve it to the freeholder, but covenants on quiet enjoyment and access still apply.
- Right of first refusal. Where a building contains flats, selling the airspace can trigger the leaseholders' right of first refusal. This comes from the Landlord and Tenant Act 1987. Get it checked before you market anything.
- Commercial buildings. Check the leases for rights over the roof, such as plant, masts or signage. Check the landlord's right to build above too.
Two planning routes to new homes on a roof
There are two ways to get consent for new homes on top of a building. The building's age and location decide which one you can use.
Permitted development and prior approval
Since August 2020, Part 20 of the permitted development rules has allowed new homes on top of some existing buildings. You do not need a full planning application. The council only checks set matters through prior approval.
| Class | Building it applies to |
|---|---|
| A | Detached, purpose-built blocks of flats |
| AA | Detached commercial or mixed-use buildings |
| AB | Terraced commercial or mixed-use buildings |
| AC | Terraced houses |
| AD | Detached houses |
The main conditions are strict:
- The building was built between 1 July 1948 and 5 March 2018. Much of central London's Georgian and Victorian stock is older.
- It is not in a conservation area and not listed. That rules out large parts of inner London.
- One or two extra storeys, depending on the class and the existing height.
- The new homes meet the national space standards.
- The council approves external appearance, neighbours' light and privacy, natural light, transport, flooding and protected views.
For a 1960s or 1970s block outside a conservation area, this route can be faster and more certain. For a period terrace in Belgravia, it is usually not available.
Full planning permission
Everything else needs a full planning application. It is judged against the London Plan and your borough's policies on height, design, heritage and housing. In central London this is the normal route.
Rooflines, mansards and set-backs are judged street by street. A pre-application enquiry is often worth it before you commit. Our airspace and upward extension service handles both routes.
Whether the building can take more floors
Planning is half the answer. The other half is physical, and it is where builders earn their place.
- Structure. New storeys add load to every floor, wall and foundation below. Many buildings have spare capacity, often only for light steel or timber frames. A structural survey and some opening-up give the real answer.
- Fire and building safety. Extra floors change the fire strategy for the whole building. At 18 metres or seven storeys with two or more homes, it becomes a higher-risk building. Then the Building Safety Regulator approves the work before it starts.
- Second staircase. Residential buildings with a storey at 18 metres or more must be checked against the second-staircase guidance early. It can decide whether a scheme works at all.
- Sound and services. The new homes need sound separation from below. They also need their own water, drainage, power and ventilation.
- Access and logistics. Cranes, scaffold, deliveries and working hours must be planned around residents or tenants.
Logistics is where rooftop schemes go over budget. At Portsoken House in Aldgate, our team delivered a £2.2M, 1,550 m² office conversion in seven months. The rest of the building stayed let. We worked nights and weekends so tenants were not disturbed. Building above an occupied building takes the same discipline.
Highly recommended! Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.
The neighbours have rights too
Two legal regimes sit alongside planning. Both can stop or delay a scheme that already has consent.
- Party walls. Raising or building on a party wall needs notices to the neighbours under the Party Wall etc. Act 1996. Most terrace schemes do this.
- Rights of light. A neighbour who has had light through a window for 20 years may have a legal right to it. It can be enforced even after planning permission. A rights of light survey belongs in the feasibility stage.
Sell the airspace, develop it or partner
Once you know what can be built, there are three ways to turn it into value.
| Route | What you keep | What you carry |
|---|---|---|
| Sell with consent | A higher price than unconsented airspace | Planning cost and time before the sale |
| Develop it yourself | All the value of the new homes | Construction, finance and sales risk |
| Partner with a developer | A share of the result | Less risk, less upside |
Selling with consent usually beats selling without it. The buyer is no longer paying for planning risk.
For freeholders of residential blocks, an airspace deal can also pay for a new roof, a lift or facade repairs. That can turn leaseholders from objectors into supporters. Craftex can co-invest, take 100% of the risk, or work on a fee or percentage basis, depending on the stage.
Weighing the routes for land rather than a roof? Read option vs promotion agreement vs joint venture.
How our team assesses airspace
We look at airspace as planners and builders at once. A first visit checks the title position, the planning route, the designations and the obvious structural questions.
If it is worth going further, a feasibility study tests the structure. It designs the options and prices them with our own construction team. Our Preconstruction Director, Martin Hickey, brings more than 50 years in construction to every appraisal.
To see what consent would add to your building, read about land value uplift. We take development schemes from £3M to £150M GDV.
Ready to find out what sits above your roof? Book a site visit and we will walk you through each check on site.
Before you sell or build on your roof
- Title and all long leases reviewed by a solicitor
- Right of first refusal position confirmed
- Planning route chosen: prior approval or full planning
- Structural survey with some opening-up
- Fire strategy and 18-metre position checked
- Party wall and rights of light risks listed
- Access, craning and working hours planned